Skip to content

Commit 85f9201

Browse files
cfanoulisrvagg
authored andcommitted
doc: update collaborator guide with LTS labels
PR-URL: #24379 Reviewed-By: Richard Lau <[email protected]> Reviewed-By: Vse Mozhet Byt <[email protected]> Reviewed-By: Luigi Pinca <[email protected]>
1 parent c5e32fd commit 85f9201

File tree

1 file changed

+13
-9
lines changed

1 file changed

+13
-9
lines changed

COLLABORATOR_GUIDE.md

+13-9
Original file line numberDiff line numberDiff line change
@@ -794,8 +794,8 @@ TSC for further discussion.
794794

795795
#### How are LTS Branches Managed?
796796

797-
There are multiple LTS branches, e.g. `v8.x` and `v6.x`. Each of these is paired
798-
with a staging branch: `v8.x-staging` and `v6.x-staging`.
797+
There are multiple LTS branches, e.g. `v10.x` and `v8.x`. Each of these is
798+
paired with a staging branch: `v10.x-staging` and `v8.x-staging`.
799799

800800
As commits land on the master branch, they are cherry-picked back to each
801801
staging branch as appropriate. If the commit applies only to the LTS branch, the
@@ -817,14 +817,18 @@ on backporting, please see the [backporting guide][].
817817

818818
Several LTS related issue and PR labels have been provided:
819819

820-
* `lts-watch-v6.x` - tells the LTS WG that the issue/PR needs to be considered
821-
for landing in the `v6.x-staging` branch.
822-
* `lts-watch-v4.x` - tells the LTS WG that the issue/PR needs to be considered
823-
for landing in the `v4.x-staging` branch.
820+
* `lts-watch-v10.x` - tells the LTS WG that the issue/PR needs to be
821+
considered for landing in the `v10.x-staging` branch.
822+
* `lts-watch-v8.x` - tells the LTS WG that the issue/PR needs to be
823+
considered for landing in the `v8.x-staging` branch.
824+
* `lts-watch-v6.x` - tells the LTS WG that the issue/PR needs to be
825+
considered for landing in the `v6.x-staging` branch.
826+
* `land-on-v10.x` - tells the release team that the commit should be landed
827+
in a future v10.x release.
828+
* `land-on-v8.x` - tells the release team that the commit should be landed
829+
in a future v8.x release.
824830
* `land-on-v6.x` - tells the release team that the commit should be landed
825-
in a future v6.x release
826-
* `land-on-v4.x` - tells the release team that the commit should be landed
827-
in a future v4.x release
831+
in a future v6.x release.
828832

829833
Any Collaborator can attach these labels to any PR/issue. As commits are
830834
landed into the staging branches, the `lts-watch-` label will be removed.

0 commit comments

Comments
 (0)